The in-depth inspection by WIDOT detected two sites that had visible cracks in the stiffener-to-hanger diaphragm welds, the east side of Hanger 6 in the north tie girder, and the east side of Hanger 4 in the south tie girder. Additionally, many ultrasonic indications were detected by WIDOT in the...
The U.S. has 542,000 bridges that consume billions of dollars per year in construction, rehabilitation and maintenance funds and which are the lifelines of U.S. commerce. The 1992 ISTEA (fntermodal Surface Transportation Efficiency Act) mandates the implementation of a quantitative computerized bridge management system by I 996. A prime need...
This report includes the findings of acoustic emission (AE) tests on the Fremont tied arch bridge in Portland Oregon conducted by research engineers from the Infrastructure Technology Institute of Northwestern University on March 24th, 1997.